Short description WH5205 -
N52 Cloghan to Billistown Phase 1 - Cloghan to Turin Realignment Detailed description N52 Cloghan to Billistown Phase 1 - Cloghan to Turin Realignment is located in
the townlands of Mountrobert, Cloghanumera, Killynan (Cooke) and Killynan
(Pratt) and is 7km northeast of Mullingar and 8km southwest of Delvin. The
project comprises the construction of 3.64km of Type 1 Single Carriageway (S2)
and the following associated Works:
(1) Two at grade ghost island junctions and simple junctions
(2) Site Clearance and Earthworks
(3) Realignment and tie in to the existing N52 and local roads.
(4) Construction of culverts and associated headwalls
(5) Construction of surface water drainage infrastructure
(6) Construction of utility diversions and ducting for utilities including ESB, Eircom
and a Watermain.
(7) Supply and installation of regulatory and warning signage.
(8) Relocation of existing directional signage
(9) Installation of road markings and road studs
(10) Construction of boundary treatment works
(11) Construction of landscape works
(12) Construction of road pavements
(13) Construction of accommodation works
The contractor will be required to produce Traffic Management plans for the N52
national secondary road and local roads. The contractor will also be appointed as
the Project Supervisor Construction Stage.
The tender drawings identify the extent of the site and required works. The full
scope of the work and obligations of the contractor are to be ascertained by
reference to the contract documents as a whole.
Type of Contract:
Works | Contracting authority Westmeath County Council
Áras An Chontae, Mountstreet, N91 FH4N Mullingar County Westmeath Ireland
View profile | Contact Ambrose Clarke
http://www.westmeathcoco.ie/ |