The development will consist of the design and construction of 429. no. bedspaces, generally arranged in 57 units of 6 en-suite bedrooms, 11 units of 5 en-suite bedrooms and 8 units of 4 en-suite bedrooms, with communal living area in each unit. Further communal areas & facilities, ancillary office/reception accommodation, internal plant/service rooms, refuse storage and covered cycle storage facilities are also provided to serve the entire development. The development will be in 1 no. 5 storey block and 3 no. 3 & 4 storey blocks, with associated courtyards, pedestrian access, vehicular access and dropoff/turning facilities, including bus shelter and parking facilities for the less mobile. Vehicular access to the development is via the existing Corrib Village access road. The development will include intensive site landscaping & boundary treatment, footpath links to Campus networks, building signage, totem signage/sculpture, connections to services and all associated works.
Works
23/05/2016 12:00:00
45214400-4 Construction work for university buildings
45000000-7 Construction work
45100000-8 Site preparation work
45112700-2 Landscaping work
45210000-2 Building construction work
45212400-0 Accommodation and restaurant buildings
45212411-0 Hotel construction work
45310000-3 Electrical installation work
45313100-5 Lift installation work
45350000-5 Mechanical installations
45443000-4 Facade work
University of Galway
University Road, H91 TK33
Galway
Ireland
View profile
Deirdre Carroll
http://www.universityofgalway.ie
| Notice | Date of dispatch |
|---|---|
| Contract notice (TED (v208)) | 14/04/2016 17:40 |
| Contract award notice (TED (v209)) | 27/01/2017 16:10 |