N52 Cloghan to Billistown Phase 1 - Cloghan to Turin Realignment is located in the townlands of Mountrobert, Cloghanumera, Killynan (Cooke) and Killynan (Pratt) and is 7km northeast of Mullingar and 8km southwest of Delvin. The project comprises the construction of 3.64km of Type 1 Single Carriageway (S2) and the following associated Works: (1) Two at grade ghost island junctions and simple junctions (2) Site Clearance and Earthworks (3) Realignment and tie in to the existing N52 and local roads. (4) Construction of culverts and associated headwalls (5) Construction of surface water drainage infrastructure (6) Construction of utility diversions and ducting for utilities including ESB, Eircom and a Watermain. (7) Supply and installation of regulatory and warning signage. (8) Relocation of existing directional signage (9) Installation of road markings and road studs (10) Construction of boundary treatment works (11) Construction of landscape works (12) Construction of road pavements (13) Construction of accommodation works The contractor will be required to produce Traffic Management plans for the N52 national secondary road and local roads. The contractor will also be appointed as the Project Supervisor Construction Stage. The tender drawings identify the extent of the site and required works. The full scope of the work and obligations of the contractor are to be ascertained by reference to the contract documents as a whole.
Works
15/06/2016 16:00:00
45233100-0 Construction work for highways, roads
45233120-6 Road construction works
Westmeath County Council
Áras An Chontae, Mountstreet, N91 FH4N
Mullingar
County Westmeath
Ireland
View profile
Ambrose Clarke
http://www.westmeathcoco.ie/
Notice | Date of dispatch |
---|---|
Contract notice (TED (v208)) | 31/03/2016 17:40 |
Contract award notice (TED (v209)) | 18/08/2016 16:40 |
As stated in Tender Documentation available to download