Irish Water is currently advancing the Ballyshannon Regional Water Supply Scheme Design Build Operate Contract comprising the construction of an intake structure at Lough Assaroe, pumping station, new WTP at Knader, storage reservoir(s) including all interconnecting pipework and some trunk/distribution mains. The works required under the contract are to be delivered on a Contractor Design- Build-Operate basis. The DBO contract is 24 months D-B with a 7 year Operation and Maintenance period, with an optional add on for up to 3 years. The planned works are necessary to ensure compliance with EU Directives, Irish National Standards and Regulations relating to treated water for human consumption.
Works
13/04/2016 12:00:00
45231300-8 Construction work for water and sewage pipelines
45232150-8 Works related to water-distribution pipelines
45232152-2 Pumping station construction work
45240000-1 Construction work for water projects
45247270-3 Reservoir construction works
45252126-7 Drinking-water treatment plant construction work
45252140-1 Sludge-dewatering plant construction work
45315100-9 Electrical engineering installation works
45351000-2 Mechanical engineering installation works
65120000-0 Operation of a water-purification plant
65130000-3 Operation of water supplies
Gas Networks Ireland
Gasworks Road
Cork
Cork
Ireland
View profile
Niamh O'Connor
http://www.gasnetworks.ie
| Notice | Date of dispatch |
|---|---|
| Contract notice - utilities (TED (v208)) | 10/02/2016 16:10 |
Notice for additional information, information on incomplete procedure or corrigendum (TED (v208))
|
18/03/2016 11:25 |
Notice for additional information, information on incomplete procedure or corrigendum (TED (v208))
|
29/03/2016 15:10 |
Irish Water is currently advancing the Ballyshannon Regional Water Supply Scheme DBO Contract comprising the construction of an intake structure at Lough Assaroe, pumping station, new WTP at Knader, storage reservoir(s) including all interconnecting pipework and some trunk/distribution mains.
A pre-qualification questionnaire (tender documents if its open procedure) will be issued to all candidates who forward an Expression of interest and send via email for the attention of The Shared Services Procurement Manager to Tenders@ervia.ie The questionnaire must be completed and returned to the address in I.1. above not later than 12.00hrs Wednesday 13th April 2016. PLEASE DO NOT REGISTER ON ETENDERS AS YOU WILL NOT RECEIVE ANY DOCUMENTATION.