The general scope required is all inclusive for the engineering, design, equipment supply, installation, commissioning and documentation for all environmental abatement equipment. Key features of the scope of supply are as follows: 1) Collection and transport of exhaust gases from Continuous Press (120,000m3/hr approx.), Press Hall (90,000m3/hr approx.) and Board Cooler (60,000m3/hr approx.) to existing Wet Electrostatic Precipitators. 2) Pre-cleaning of the exhaust gas from the Continuous Press (120,000m3/hr approx.) 3) ATEX Certified equipment where necessary. 4) Fire and explosion protection. 5) External equipment suitable for coastal region. 6) Declaration of Conformity for installed assembly in line with EU Machinery Directive 2006/42/EC. SmartPly is relying on the Bidder as an expert in their field to propose a system(s) that provides the exhaust gas extraction needs in a cost effective and efficient manner in line with best technology practice. This notice is a voluntary publication from an Industrial Subsidiary of Public Authority therefore the EU Directive time-lines do not apply. Smartply will not be responsible for any costs in connection with the procurement procedure, irrespective of the outcome, whether or not the procedure is cancelled or postponed. Candidates are requested to download the PQQ, complete and return 3 hard copies by the deadline date stated.
Supplies
15/08/2014 15:00:00
45351000-2 Mechanical engineering installation works
71313450-4 Environmental monitoring for construction
71323000-8 Engineering-design services for industrial process and production
71323200-0 Plant engineering design services
90700000-4 Environmental services
SmartPly Europe DAC
Belview
Slieverue
Co Waterford
Ireland
View profile
Frank Moran
| Notice | Date of dispatch |
|---|---|
| Contract Notice (eTenders) | 30/07/2014 17:10 |
| Contract notice (TED (v208)) | 30/07/2014 16:38 |