The scope of the project is an extension and refurbishment of the existing NW Hospice which is currently located at level 03 of the existing hospital. The extension to the existing hospice would create a new 12 bedded in patient unit with all support facilities. Refurbishment of existing areas to provide day care and outpatient facilities. New facility should be fully compliant with modern HBN standards and infection Control Standards. The existing Hospice is located within the 1940’s building of the existing hospital which is a protected structure. The site is sloping bordered by Connaughton Road on the Western boundary and the main hospital to the east. The main Laboratories for the hospital are directly above the existing Hospice on Level 04 and the Haematology and Dialysis’ Departments are in close proximity to the selected site. Hard landscaping and site fittings to sloped entrance, external stairs to the car park, external steps to the front entrance, retaining boundary walls and all associated site works. New Build 1,519m2, Basement Car Park 485m2 and Refurbishment 772m2
Works
16/01/2023 12:00:00
45000000-7 Construction work
44211100-3 Modular and portable buildings
45215100-8 Construction work for buildings relating to health
45310000-3 Electrical installation work
45331000-6 Heating, ventilation and air-conditioning installation work
45350000-5 Mechanical installations
45453100-8 Refurbishment work
Health Service Executive (HSE)
Head Office
Millennium Park
Naas
Ireland
View profile
Karen Carlin
http://www.hse.ie
Notice | Date of dispatch |
---|---|
Contract notice (TED (v209)) | 28/11/2022 12:26 |
Attached as document