Mechanical reserved specialists’ role shall consist of the installation, testing and commissioning of all mechanical installations including sub-specialists works associated with the works. Extension to the existing historic Newtown School campus involving demolition of 5 no. existing classroom blocks and construction of a new three storey Classroom Block extension including passenger lift and Special Educational Needs Block (5,339m2), new single storey PE Facility building (1,149m2), new vehicular entrance, car parking, boundary wall realignment, new substation and construction store, together with associated landscaping and external works. All within the curtilage of two Protected Structures. Reserved specialists shall be pre-selected for Mechanical Installations, directly and separately tendered by the Contracting Authority for appointment by the main contractor upon award of the main contract.
Works
06/12/2022 17:00:00
45350000-5 Mechanical installations
Newtown School
Newtown Road
Co.Waterford
Waterford
Ireland
View profile
David Clarke
Notice | Date of dispatch |
---|---|
Contract notice (TED (v209)) | 07/11/2022 16:11 |