This project is part of continuing series of Pilot Schemes focusing on Schools Energy Upgrades whose objective is to deliver significant improvements works to two (2) schools during 2023/24 (primarily during school holiday periods). The shared objectives of the programme are to implement a range of energy efficiency measures in a number of typical schools to achieve: 50% reduction in Carbon Emissions 50% reduction in Direct Carbon Emissions 50% reduction in Primary Energy BER Grade B Renewable Heat – 90% of space heating St Nessans NS Mungret & Hazelwood College, Dromcollogher
Works
16/03/2023 12:00:00
45000000-7 Construction work
45214200-2 Construction work for school buildings
45214210-5 Primary school construction work
45220000-5 Engineering works and construction works
45300000-0 Building installation work
45310000-3 Electrical installation work
45315100-9 Electrical engineering installation works
45320000-6 Insulation work
45331000-6 Heating, ventilation and air-conditioning installation work
45351000-2 Mechanical engineering installation works
45400000-1 Building completion work
45420000-7 Joinery and carpentry installation work
45421100-5 Installation of doors and windows and related components
45440000-3 Painting and glazing work
45441000-0 Glazing work
45450000-6 Other building completion work
45453000-7 Overhaul and refurbishment work
45453100-8 Refurbishment work
71200000-0 Architectural and related services
71220000-6 Architectural design services
71310000-4 Consultative engineering and construction services
71324000-5 Quantity surveying services
Limerick and Clare Education and Training Board
Procurement/Capital Works Section, Station Road
Co.Clare
Ennis
Ireland
View profile
Marie Cooney
https://lcetb.ie/
| Notice | Date of dispatch |
|---|---|
| Contract notice (TED (v209)) | 01/11/2022 18:11 |
Corrigendum (TED (v209))
|
09/01/2023 12:10 |
Corrigendum (TED (v209))
|
30/01/2023 12:26 |