The development comprises • the demolition of the rear single storey structure (785sqm) of the existing building • the construction of a new 3 storey extension (406sqm), comprising an entrance lobby, lift, stairway, toilets, circulation and plant rooms to the rear of the existing main building • the refurbishment, reconfiguration and alterations of the central section of the existing building (1300sqm) • the construction of 2 no. above ground fire fighting water storage tanks • the construction of carparking, drainage, landscaping, signage and all associated site works.
Works
10/11/2022 16:00:00
45210000-2 Building construction work
Údarás Na Gaeltachta
Na Forbacha
Co. na Gaillimhe
Ireland
View profile
KOBW Architects
http://www.udaras.ie
Notice | Date of dispatch |
---|---|
Contract notice (TED (v209)) | 10/10/2022 16:41 |