Full upgrade of the existing heating system with the integration of a new biomass unit 215KW. The supplier shall allow for the delivery and manufacture of plant. The supplier shall a prefabricated containerised biomass wood pellet boiler installation in compliance with Architects drawings & specification and M&E drawings and specification. Connection into the existing LTHW heating system installation. Biomass boiler will act as primary boiler with natural gas boiler installation as assist and backup in event of failure/downtime of biomass boiler (including all necessary control configuration) Supply and sale of heat/fuel to school for set contract period in the form of wood pellet fuel and operation of the heating biomass boiler for 15 years
Works
28/10/2022 12:00:00
45331110-0 Boiler installation work
45232141-2 Heating works
45331000-6 Heating, ventilation and air-conditioning installation work
45350000-5 Mechanical installations
45351000-2 Mechanical engineering installation works
51100000-3 Installation services of electrical and mechanical equipment
71314310-8 Heating engineering services for buildings
71321000-4 Engineering design services for mechanical and electrical installations for buildings
71321200-6 Heating-system design services
71333000-1 Mechanical engineering services
St. Anne's Primary School
Kilcarrig Avenue, Fettercairn, Tallaght, Dublin 24
Dublin
Ireland
View profile
Mary Cullen
Notice | Date of dispatch |
---|---|
Contract notice (TED (v209)) | 27/09/2022 17:11 |