Loreto Secondary School is voluntary secondary school under the patronage of the Loreto Education Trust. Please see attached Project Brief & Schedule of Additional Accommodation. In summary, the project will comprise: Section A • 1 x Science Lab 88.6 m2 • 1 x Prep Area 38.5 m2 • Toilets 18.5 m2 • Lockers 7.2 m2 • Giving a floor area including internal walls and circulation of 198.1 m2 Section B • Two Classroom SEN Base 409 m2 Giving a floor area (incl circulation and internal walls of 523.5 m2 Giving a Gross Floor Area (including circulation, internal walls & stairs) 722 m2 Also: • Secure Hard and soft play area 100 m2 • Sensory Garden 100 m2 • 6 parking spaces Also: • Buildings for Demolition: Prefabs 250 m2 INTERIM TEMPORARY ACCOMMODATION • Please note: Once appointed, the Design Team (DT) will be tasked with the provision of interim temporary accommodation (100 m2), including all required statutory approvals and compliances, to be used by the school until such time that the permanent structure has been completed. The DT are to ensure that the location of the interim temporary accommodation does not impede the development of the permanent additional accommodation.
Services
06/10/2022 13:00:00
71334000-8 Mechanical and electrical engineering services
71300000-1 Engineering services
71314310-8 Heating engineering services for buildings
71318000-0 Advisory and consultative engineering services
71320000-7 Engineering design services
71330000-0 Miscellaneous engineering services
71333000-1 Mechanical engineering services
Loreto Secondary School (Letterkenny)
Letterkenny
Co. Donegal
Letterkenny
Ireland
View profile
Gerardine Mullen
Notice | Date of dispatch |
---|---|
Contract notice (TED (v209)) | 03/09/2022 13:41 |