201964 - Ballygiblin National School SWS 2022, Heating System Upgrade

The RFT has ended, you cannot answer the invitation.

The project consists of the decommissioning and removal of the existing oil boiler and associated single pipe distribution network, and the installation of a new LPG cascade boiler configuration, a new two pipe distribution network that is future proofed and capable of supporting the integration of renewable heating solutions such as heat pumps, and compliant to current DoE TGD’s. The mechanical contractor must include for all electrical attendances, civil and builders works, and making good after installation.

Works

01/07/2022 13:00:00

45232141-2  Heating works
39715000-7  Water heaters and heating for buildings; plumbing equipment
39715200-9  Heating equipment
39715210-2  Central-heating equipment
44621110-3  Central-heating radiators
45000000-7  Construction work
45210000-2  Building construction work
45214200-2  Construction work for school buildings
45214210-5  Primary school construction work
45220000-5  Engineering works and construction works
45251200-3  Heating plant construction work
45259300-0  Heating-plant repair and maintenance work
45331100-7  Central-heating installation work
45350000-5  Mechanical installations
71314310-8  Heating engineering services for buildings
71334000-8  Mechanical and electrical engineering services


Tipperary Energy Agency
19 Silver St
Tipperary
Nenagh
Ireland
View profile

TEA TEA
http://www.tippenergy.ie

Published notices
Contract notice (TED (v209)) 13/06/2022 19:41
    Corrigendum (TED (v209)) 29/06/2022 11:56
Lots
Ballygiblin National School SWS 2022, Heating System Upgrade
Additional information:
Documents Documents
RFT mailing address:
93 Silver Street
Nenagh
Co. Tipperary
Ireland
Close