The FASTER project is a joint cross border project across Scotland, the border Counties of Ireland and Northern Ireland to support the overarching ambition to transition to low carbon transport systems and to demonstrate how each of the three jurisdictions can provide early systems learning in relation to the electrification of transport. There is a total of seven project partners and 15 associate partners from across the three jurisdictions. The partnership will implement the physical rollout of 73 rapid charging stations in the programme area. Led by East Border Region Ltd. the project has considered the common policy ambition across Scotland, Ireland, and Northern Ireland, which is to transition to a low carbon transport system between now and 2040. One of the main barriers to the take up of these electric vehicles is the lack of public charging infrastructure and in particular rapid charging locations. The project aims to ensure that the availability of charging stations is not a major obstacle to Electric Vehicle (EV) market penetration with the proposal to carry out the design, analysis, procurement, installation, and operation of 73 Rapid Chargers (60kw per charger with the capacity to deliver 120kw where only one car is connected to the charger) across the three programme jurisdictions. There must be cross compatibility between the three jurisdictions which may be achieved using contactless card payments or other methods. The FASTER project has been awarded funding for the project’s capital costs from the European Union’s INTERREG VA Programme, managed by the Special EU Programmes Body (SEUPB). Funding of operational and maintenance expenditure is the responsibility of LCC and their border county delivery partners.
Services
07/05/2022 17:00:00
51100000-3 Installation services of electrical and mechanical equipment
30163000-9 Charge cards
31000000-6 Electrical machinery, apparatus, equipment and consumables; lighting
31158000-8 Chargers
31681500-8 Rechargers
34000000-7 Transport equipment and auxiliary products to transportation
45000000-7 Construction work
45200000-9 Works for complete or part construction and civil engineering work
45310000-3 Electrical installation work
45311000-0 Electrical wiring and fitting work
45311200-2 Electrical fitting work
45315000-8 Electrical installation work of heating and other electrical building-equipment
45315100-9 Electrical engineering installation works
45350000-5 Mechanical installations
48000000-8 Software package and information systems
50000000-5 Repair and maintenance services
50324100-3 System maintenance services
51110000-6 Installation services of electrical equipment
71242000-6 Project and design preparation, estimation of costs
71244000-0 Calculation of costs, monitoring of costs
71245000-7 Approval plans, working drawings and specifications
71248000-8 Supervision of project and documentation
71600000-4 Technical testing, analysis and consultancy services
72400000-4 Internet services
98351100-9 Car park services
Louth County Council
County Hall, Millennium Centre
Dundalk, Co. Louth
Ireland
View profile
Kim Callan
Notice | Date of dispatch |
---|---|
Contract notice (TED (v209)) | 07/04/2022 17:11 |