This commission seeks to engage a competent and experienced Wind Testing Laboratory to undertake and report on a regime of Wind Tunnel Tests of a cable stayed bridge and rolling bascule opening span. The laboratory will be required to carry out wind climate analysis and several wind tunnel tests of the deck and the tower to assess the aerodynamic behaviour of the structure, such as sectional model tests and assessment of wind shielding efficiency. The laboratory is required to issue a report on the results.
Services
21/03/2022 14:00:00
71000000-8 Architectural, construction, engineering and inspection services
71335000-5 Engineering studies
71621000-7 Technical analysis or consultancy services
71900000-7 Laboratory services
Louth County Council
County Hall, Millennium Centre
Dundalk, Co. Louth
Ireland
View profile
Marie Quigley
Notice | Date of dispatch |
---|---|
Contract notice (TED (v209)) | 14/02/2022 15:11 |
Contract award notice (TED (v209)) | 17/05/2022 17:11 |