Phased demolition of the existing 1,980m2 single storey Rush National School building and associated outbuildings. Construction of a new 5,717m2 two-storey school building with complex phasing, requiring multiple decant, on a live operational campus within the extremely restricted existing school site. The new school will contain 32 classrooms, a 2 class Special Educational Needs Unit, general purposes hall, library, resource area, administration and staff areas, storage and ancillary accommodation. Site development works include new boundary treatment, landscaping, car parking areas, ball courts, new play areas, bicycle storage, bin store and ancillary works. Construction, relocation and removal of extensive temporary accommodation. Construction and removal of a 65m2 single storey temporary building unit and three temporary ball courts on a separate site, located approximately 200m north-east of the existing school site. These facilities will be used for recreational purposes by the pupils of Rush National School while the works are being carried out on the existing school site. Reserved Specialists for the Mechanical and Electrical Services Installations are being pre-selected and procured separately from the Main Contract and on appointment will be required to enter into contract with the Main Contractor. The applicant should demonstrate experience of working on multiple phased contracts within a restricted urban site where the existing facilities remain fully operational during the works by reference to educational or equivalent projects of similar nature and size to this project.]
Works
22/09/2021 12:00:00
45214200-2 Construction work for school buildings
Rush National School
Channel Road, Rush
Dublin
Dublin
Ireland
View profile
Jeff McCormick
Notice | Date of dispatch |
---|---|
Contract notice (TED (v209)) | 19/08/2021 12:11 |