Construction of a new elevated 3 storey building adjacent to the existing Emergency Department. The building will consist of 10 ICU beds and 4 ICU isolation lobbies on Level 1 (First Floor) with office accommodation and both internal and screened external plant areas at Level 2 (Second Floor). The development will also comprise of modifications to the ambulance arrivals area and local services infrastructure upgrades and rationalisation in the vicinity of the proposed new building. The proposed development is located to the north eastern side of the Clinical Services Building (Block N), on the western side of the hospital campus. The proposed building will be up to three storeys high, the ground floor (Level 00) will not be developed under this scope; Level )) will comprise lifts shafts, and evacuation lobby, some screening and structural elements. A small basement will be provided to gain access to the existing Block N carpark and to route critical utility services from the basement of Block N into the new building. There will be services interconnections with the existing Clinical Services Building (Block N).
Works
06/09/2021 12:00:00
45215100-8 Construction work for buildings relating to health
24111500-0 Medical gases
44211100-3 Modular and portable buildings
45111000-8 Demolition, site preparation and clearance work
45111291-4 Site-development work
45112400-9 Excavating work
45210000-2 Building construction work
45215130-7 Clinic construction work
45215140-0 Hospital facilities construction work
45215143-1 Diagnostic screening room construction work
45223200-8 Structural works
45231000-5 Construction work for pipelines, communication and power lines
45232451-8 Drainage and surface works
45233222-1 Paving and asphalting works
45233293-9 Installation of street furniture
45310000-3 Electrical installation work
45312000-7 Alarm system and antenna installation work
45312100-8 Fire-alarm system installation work
45312200-9 Burglar-alarm system installation work
45312320-6 Television aerial installation work
45313100-5 Lift installation work
45315500-3 Medium-voltage installation work
45331200-8 Ventilation and air-conditioning installation work
45340000-2 Fencing, railing and safety equipment installation work
45351000-2 Mechanical engineering installation works
90650000-8 Asbestos removal services
St Vincent's University Hospital
Elm Park
Dublin 4
Ireland
View profile
Bill Byrne
http://www.stvincents.ie
| Notice | Date of dispatch |
|---|---|
| Contract notice (TED (v209)) | 06/08/2021 16:56 |
SAQ - for Works Contractor and as PSCS for Intensive Care Unit at St.Vincent's University Hospital.
SAQ submissions are to be submitted electronically via ETenders.