The Irish Defence Forces Corps of Engineers requires Assault Bridging Equipment for use to support Defence Forces operations and training activities in Ireland. These Bridge Systems should be capable of spanning a wet or dry gap up to 30m in span. The bridge should consist of a series of man portable panels which are joined together and cantilevered across the gap. The Bridge system and all component parts should be stored on a frame/in a container no larger in dimensions than a 20ft ISO Container. The entire system should be transportable on a DROPS (Demountable Rack Offload and Pickup System) vehicle and should also be capable of transportation underslung from a helicopter. This specification covers Assault Bridging equipment and will include the supply, delivery to site, off-loading, testing, commissioning and training on the system. The Supplier should therefore include the cost for the supply, delivery to site, testing, commissioning and training on the system to be supplied. This covers from acceptance by the Corps of Engineers.
Supplies
12/05/2021 12:00:00
44212100-0 Bridge
34144300-1 Mobile bridges
44212110-3 Bridge sections
Irish Defence Forces
Defence Force Headquarters, station road
Kildare
Newbridge
Ireland
View profile
Brian Coughlan
https://military.ie/en/#1
Notice | Date of dispatch |
---|---|
Contract notice (TED (v209)) | 07/04/2021 17:11 |
Contract award notice (TED (v209)) | 29/06/2021 17:11 |