IDA Waterford B&T Park - IDA Waterford Infrastructure Upgrade Works

The RFT has ended, you cannot answer the invitation.

There are main objectives as part of the Waterford Infrastructure Upgrade Works: The existing road surface which is a mix of Concrete/ Asphalt/ Concrete with Asphalt overlay is to be removed and replaced with a new Asphalt surface over bitumen base and road base course with regulation of the sub grade. Removal of existing and replacement of all footpath and kerbing as noted on the drawings. Provision of new cycle lane to parts of the Business Park. Removal in part and upgrade of foul and surface water infrastructure. Removal and replacement of existing asbestos watermain with new watermain throughout the park complete with all fixtures and fittings, values and chambers. Localised replace and replacement of utility and service chamber frames and covers, ducting and public lighting. Associated accommodation works and retaining structures to facilitate the new construction elements. The full scope of the Works and the obligations of the Contractor are to be ascertained by reference to the Contract Documents and Drawings as a whole.

Works

15/04/2021 12:00:00

45000000-7  Construction work
45200000-9  Works for complete or part construction and civil engineering work
45233100-0  Construction work for highways, roads
45233120-6  Road construction works
45233121-3  Main road construction works
45233141-9  Road-maintenance works
45233142-6  Road-repair works
45233220-7  Surface work for roads


IDA Ireland
Three Park Place
Hatch Street Upper
Dublin 2
Ireland
View profile

Colin Wilson
http://www.idaireland.com

Published notices
Contract notice (TED (v209)) 17/02/2021 13:11
    Corrigendum (TED (v209)) 19/03/2021 15:25
Contract award notice (TED (v209)) 13/07/2021 13:11
Lots
IDA Waterford Infrastructure Upgrade Works
Additional information:
Documents Documents
Close