This project scope includes for design, manufacture with factory acceptance test (FAT), transport and installation of one 3 tunnel Passenger Boarding Bridge (hereafter referred to as a PBB) on site at the Pier Building in Shannon Airport. The new PBB supply will cover all major components including the rotunda support column, rotunda including the connection corridor to the Pier Building, tunnel sections, bridgehead, service stairs, vertical drive and wheel drive unit and all other equipment detailed in this specification. The PBB supplier will be responsible for all on-site works
Supplies
29/03/2021 15:00:00
34969100-8 Passenger boarding bridges for aircraft
34960000-4 Airport equipment
34969000-7 Passenger boarding bridges and stairs for aircraft
45213353-2 Installation works of passenger boarding bridges
Shannon Airport Authority DAC
Shannon Airport, Shannon
Co.
Clare
Ireland
View profile
Patricia Cassidy
http://www.shannonairport.ie
Notice | Date of dispatch |
---|---|
Contract notice - utilities (TED (v209)) | 16/02/2021 13:11 |
![]() |
19/03/2021 13:55 |
Contract award notice - utilities (TED (v209)) | 18/08/2021 12:11 |