Supply of a Passenger Boarding Bridge Installation to Shannon Airport Authority DAC

The RFT has ended, you cannot answer the invitation.

This project scope includes for design, manufacture with factory acceptance test (FAT), transport and installation of one 3 tunnel Passenger Boarding Bridge (hereafter referred to as a PBB) on site at the Pier Building in Shannon Airport. The new PBB supply will cover all major components including the rotunda support column, rotunda including the connection corridor to the Pier Building, tunnel sections, bridgehead, service stairs, vertical drive and wheel drive unit and all other equipment detailed in this specification. The PBB supplier will be responsible for all on-site works

Supplies

29/03/2021 15:00:00

34969100-8  Passenger boarding bridges for aircraft
34960000-4  Airport equipment
34969000-7  Passenger boarding bridges and stairs for aircraft
45213353-2  Installation works of passenger boarding bridges


Shannon Airport Authority DAC
Shannon Airport, Shannon
Co.
Clare
Ireland
View profile

Patricia Cassidy
http://www.shannonairport.ie

Published notices
Contract notice - utilities (TED (v209)) 16/02/2021 13:11
    Corrigendum (TED (v209)) 19/03/2021 13:55
Contract award notice - utilities (TED (v209)) 18/08/2021 12:11
Lots
Supply of a Passenger Boarding Bridge Installation to Shannon Airport Authority DAC
Additional information:
Documents Documents
Close