Multi-Party Framework for Architect and Engineer Led Integrated Design Teams in 4 Lots/Creatlacha Ilpháirtí d’Fhoirne Deartha Comhtháite faoi stiúir Ailtire agus Innealtóra i 4 mhír

The RFT has ended, you cannot answer the invitation.

Establishment of Multiparty Framework for Integrated Design Team Services for Údarás na Gaeltachta: Lot 1: Architect Led IDT for Counties Galway, Mayo and Meath Lot 2: Engineer Led IDT for Counties Galway, Mayo and Meath Lot 3: Architect Led IDT for County Donegal Lot 4: Engineer Led IDT for County Donegal Each framework agreement will be established with 5 economic operators comprising the following disciplines: (a) Architectural Services and associated specialist skills, (b) Civil & Structural Engineering Services and associated specialist skills, and (c) Building Services (Mechanical & Electrical). (d) Quantity Surveying Services Work scope for all Lots will relate primarily to design of new buildings and the adaptive re-use and refurbishment of existing buildings in all the regions. Each framework will be established for a period of four (4) years.

Services

01/02/2021 12:00:00

71250000-5  Architectural, engineering and surveying services
71000000-8  Architectural, construction, engineering and inspection services
71200000-0  Architectural and related services
71210000-3  Advisory architectural services
71220000-6  Architectural design services
71221000-3  Architectural services for buildings
71223000-7  Architectural services for building extensions


Údarás Na Gaeltachta
Na Forbacha
Co. na Gaillimhe
Ireland
View profile

Claire Graydon
http://www.udaras.ie

Published notices
Contract notice (TED (v209)) 16/12/2020 12:11
Lots
Lot 1 Architect Led Integrated Design Team for Counties Galway, Mayo and Meath
Additional information:
Documents Documents
Lot 2 Engineer Led Integrated Design Team for Counties Galway, Mayo and Meath.
Additional information:
Documents Documents
Lot 3 Architect Led Integrated Design Team for County Donega
Additional information:
Documents Documents
Lot 4 Engineer Led Integrated Design Team for County Donegal
Additional information:
Documents Documents
Close