The proposed road scheme involves the construction of Belmayne Main Street from the Malahide Road to New Priory and road improvement works at Belmayne Avenue and Parkside Boulevard. In overall terms the scheme involves new road construction from the Malahide Road to New Priory including traffic lanes, bus lanes, parking, cycle facilities and footpaths. Traffic signal installations are required at the Malahide Road to facilitate a bus gate, Western Greenway, Churchwell Crescent, Belmayne Avenue, Parkside Boulevard, Belmayne Park South and to the east of Belmayne Avenue. Requirements include the following: 1.Site clearance and enabling works including removal of existing pyritic stone below existing pavements and drainage; 2. Full depth road, parking, cycleway and footway construction; 3. Installation of bus stops and associated infrastructure; 4. Upgrading of existing drainage and construction of new drainage and attenuation; 5. Installation of watermains and utilities; 6. Utility diversions and associated works; 7. Installation of ESB 38KV ducting and diversion of existing 38KV overhead powerlines; 8. Installation of traffic signals including provision of pedestrian and cyclist crossing facilities; 9. Road resurfacing works; 10. Installation of new signage and road markings along the route; 11. Installation of new public lighting; 12. Installation of tree pits; For further information please refer to attached documentation. Please note that this project is subject to funding.
Works
17/09/2020 12:00:00
45000000-7 Construction work
45200000-9 Works for complete or part construction and civil engineering work
45220000-5 Engineering works and construction works
45230000-8 Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork
45231000-5 Construction work for pipelines, communication and power lines
45233000-9 Construction, foundation and surface works for highways, roads
45233100-0 Construction work for highways, roads
45233120-6 Road construction works
45233160-8 Paths and other metalled surfaces
45233200-1 Various surface works
45233220-7 Surface work for roads
45233290-8 Installation of road signs
45233300-2 Foundation work for highways, roads, streets and footpaths
Dublin City Council
Civic Offices, Wood Quay
Dublin
Dublin 8
Ireland
View profile
Derek Graydon
Notice | Date of dispatch |
---|---|
Contract notice (TED (v209)) | 22/07/2020 16:10 |
![]() |
02/09/2020 11:55 |
Contract award notice (TED (v209)) | 11/10/2021 15:11 |