Improvements to the 2.1 Km section of existing Greenway from the Bilberry Car Park to the Clock Tower at Waterford City Centre, works will comprise a combination of the following: 1. 1.6 Km's of 4m wide Greenway along an existing road, and 0.5kms of 6m wide Greenway parallel to an existing Quay Flood Wall. 2. Construction of 2 x 4m wide Board Walk structures approximately 150m each in length. 3. Boundary treatment comprising a combination of RC retaining walls, 'perma crib' type walls, stone faced walls and earth embankments. 4. Traffic signal and lane alterations works at the Rice Bridge / Bridge st Junction. 5. Improvements to Public Lighting. 6. Utility diversions (ESB, GNI, Water, Foul and Surface Water, Telecoms, and under grounding of O/H's) 7. Road drainage improvements. 8. Road realignment, reinstatement and lining. 9. Paving works including exposed aggregate, limestone/granite slabs/blocks/setts. 10. All other associated ancillary works such as service ducts, road signs, .and way-finding signage.
Works
17/08/2020 15:00:00
45220000-5 Engineering works and construction works
44212400-3 Piling
45000000-7 Construction work
45221113-7 Footbridge construction work
45222000-9 Construction work for engineering works except bridges, tunnels, shafts and subways
45223000-6 Structures construction work
45223210-1 Structural steelworks
45231300-8 Construction work for water and sewage pipelines
45232411-6 Foul-water piping construction work
45232450-1 Drainage construction works
45233120-6 Road construction works
45233161-5 Footpath construction work
45233162-2 Cycle path construction work
45233260-9 Pedestrian ways construction work
Waterford City and County Council
City Hall, The Mall
Co.Waterford
Waterford
Ireland
View profile
Paul Flynn
Notice | Date of dispatch |
---|---|
Contract notice (TED (v209)) | 09/07/2020 17:40 |
Contract award notice (TED (v209)) | 03/09/2021 14:41 |
As per requirements of RFQ or RFT