Multi-Party Framework Agreement for Carrying out Roadworks in a City and Suburban Environment for Contracts greater than €1m and less than €5m (2020-2023)

The RFT has ended, you cannot answer the invitation.

Dublin City Council and Dún Laoghaire-Rathdown County Council intend to establish a Multi-Party Framework Agreement for Roadwork Contracts greater than €1 million (excl. VAT) and less than €5 million (excl. VAT). The term of the Framework will be for 36 months with an option to extend for further 12 month period. The works will take place in both the DCC & DLRCC administrative areas and will be completed in the public realm in city and sub-urban environments including work on local, regional and national roads. The frequency, scale and type of project vary from year to year depending on funding availability (internally and externally) and the needs of the Authorities. It is envisaged that the minimum spend over the life of the Multi- Party Framework Agreement will be €10m (excl. VAT) and the maximum spend will be €60m (excl. VAT) Works to be carried out under the Framework Agreement may include some or all of the following activities: i) Installation of ducts and construction of chambers ii) Roadway construction & repairs (flexible, rigid & permeable paving) iii) Footway construction, repairs & refurbishment (including concrete, bituminous, brick, flags etc.) iv) Installation of kerbing and road channels v) Road resurfacing and high friction antiskid surfacing and associated work including planing, regulation course, geogrids etc. vi) Granite paving including antique granite flags vii) Construction of gully pots and manhole chambers viii) Pipelaying including foul sewers, surface/stormwater pipelines and filter drains ix) Diversion of services x) Road and street improvements (including widening and narrowing) xi) Traffic management including development & implementation of Traffic Management Plans xii) Installation of Public Lighting columns & associated works xiii) Construction of cycleways & greenways xiv) Installation of traffic islands including traffic signals (Please refer to attached documents for further information).

Works

17/08/2020 12:00:00

45233120-6  Road construction works
03452000-3  Trees
14212410-7  Topsoil
45111250-5  Ground investigation work
45112100-6  Trench-digging work
45112210-0  Topsoil-stripping work
45112700-2  Landscaping work
45112710-5  Landscaping work for green areas
45112730-1  Landscaping work for roads and motorways
45213315-4  Bus-stop shelter construction work
45221111-3  Road bridge construction work
45231300-8  Construction work for water and sewage pipelines
45232130-2  Storm-water piping construction work
45232450-1  Drainage construction works
45232451-8  Drainage and surface works
45232452-5  Drainage works
45233100-0  Construction work for highways, roads
45233121-3  Main road construction works
45233124-4  Trunk road construction work
45233125-1  Road junction construction work
45233140-2  Roadworks
45233141-9  Road-maintenance works
45233142-6  Road-repair works
45233150-5  Traffic-calming works
45233161-5  Footpath construction work
45233162-2  Cycle path construction work
45233220-7  Surface work for roads
45233223-8  Carriageway resurfacing works
45233253-7  Surface work for footpaths
45233290-8  Installation of road signs
45233291-5  Installation of bollards
45233292-2  Installation of safety equipment
45233293-9  Installation of street furniture
45233294-6  Installation of road signals
45316110-9  Installation of road lighting equipment


Dublin City Council
Civic Offices, Wood Quay
Dublin
Dublin 8
Ireland
View profile

Tim Linehan

Published notices
Contract notice (TED (v209)) 18/06/2020 12:10
    Corrigendum (TED (v209)) 05/08/2020 13:10
Contract award notice (TED (v209)) 22/11/2022 14:11
Lots
Multi-Party Framework Agreement for Carrying out Roadworks in a City and Suburban Environment for Contracts greater than €1m and less than €5m (2020-2023)