Lahinch Seaworld Leisure Centre - Upgrade Refurbishment Works to Lahinch Seaworld and Leisure Centre

The RFT has ended, you cannot answer the invitation.

Upgrade Refurbishment Works to Lahinch Seaworld and Leisure Centre consists of demolition of existing tower in courtyard, to erect 2no 5m high pellet silos and 5.2 m high screening to enclose silos at rear of existing building and provide internal M&E room associated with same, 15no geo-thermal boreholes in connection with proposed heating system, construct a two storey extension consisting of the gym, changing rooms, associated toilets and showers, proposed single storey plant room at rear of building, to provide upgrade to existing front facade to include new access ramps, proposed shelter booths, entrance, lobby area, external cafe seating area, revised terrace and canopy area at main entrance courtyard, to move the children's swimming pool into the main pool hall area, to install new rooflights and upgrade to existing roof and external wall finishes throughout, to carry out internal changes to the main pool hall, changing room areas, gym area and main entrance area along with associated site works at The Promenade, Dough, Lahinch, Co. Clare

Works

12/06/2020 12:00:00

45000000-7  Construction work
44000000-0  Construction structures and materials; auxiliary products to construction (except electric apparatus)


Lahinch Seaworld PLC
The Promenade, Lahinch
Co.Clare
Lahinch
Ireland
View profile

Joe Garrihy

Published notices
Contract notice (TED (v209)) 12/03/2020 12:11
Contract award notice (TED (v209)) 22/09/2020 15:10
Lots
Upgrade Refurbishment Works to Lahinch Seaworld and Leisure Centre
Additional information:
Documents Documents
Close