NCH2019SURVEY - National Concert Hall Redevelopment Programme Measured Building Survey

The RFT has ended, you cannot answer the invitation.

The National Concert Hall (NCH), as part of the Earlsfort Terrace Cultural Quarter development, will consist of a 3 phased development involving major refurbishment of the complex. Phase 1 involves enabling works including works to Pathology Building, provision of temporary boilers, statutory approval for demolition of Anatomy building, rationalisation of Butler Wings, relocation of NCH Restaurant and Call Centre. Phase 2 involves refurbishment, upgrade and extension to existing 1865 block, including auditorium extension, new orchestra rehearsal space and backstage facilities. Phase 3 involves design of 500 seater recital space. Phase 1 works also include development of a National Children’s Science Centre involving refurbishment and restoration of existing north and part of east wing of NCH building and Real Tennis building, construction of new 4 storey over basement extension with planetarium dome to west of existing NCH and basement link from Concert Hall to Real Tennis building.

Services

02/10/2019 12:00:00

71251000-2  Architectural and building-surveying services
71250000-5  Architectural, engineering and surveying services


Office of Public Works (OPW)
Jonathan Swift Street
Co. Meath, C15 NX36
Trim
Ireland
View profile

Claire McKevett
https://www.gov.ie/en/organisation/office-of-public-works/

Published notices
Contract notice (TED (v209)) 28/08/2019 17:10
Contract award notice (TED (v209)) 08/01/2020 16:25
Lots
National Concert Hall Redevelopment Programme Measured Building Survey
Additional information:
Documents Documents
RFT mailing address:
52 St. Stephen's Green
Dublin 2
Ireland
Close