The proposed works will comprisie of the extention of the existing access road and utility infrastructure to facilitate the development of IDA Ireland’s 44.5ha site at Mullagharlin, Dundalk, Co. Louth. The works will include road construction (including 2 No. roundabouts), footpaths, drainage, SuDS, foul pumping station (reinforced concrete tank and control building), rising mains, street lighting, utilities, signage, road markings and landscaping including screening mounds, deep excavations/trenchless techniques. The works are to be completed by the end of July 2020.
Works
26/07/2019 15:00:00
45210000-2 Building construction work
45220000-5 Engineering works and construction works
45231000-5 Construction work for pipelines, communication and power lines
45232152-2 Pumping station construction work
45232450-1 Drainage construction works
45233120-6 Road construction works
45233161-5 Footpath construction work
45310000-3 Electrical installation work
45350000-5 Mechanical installations
IDA Ireland
Three Park Place
Hatch Street Upper
Dublin 2
Ireland
View profile
Emmet Devereux
http://www.idaireland.com
Notice | Date of dispatch |
---|---|
Contract notice (TED (v209)) | 01/07/2019 12:10 |
The objective of the project is to extend the existing road and utility infrastructure to facilitate the development of IDA Ireland’s 44.5ha site at Mullagharlin, Dundalk, Co. Louth. The works will include road construction, footpaths, drainage, SuDS, foul pumping station, rising mains, street lighting, utilities, signage, road markings and landscaping including berms.