Provision of Consultancy Services for the preparation of Environmental Impact Assessments and Transport Impact Assessments for the BusConnects Core Bus Corridor Programme

The RFT has ended, you cannot answer the invitation.

The NTA requires a Service Provider (SP) to undertake services relating to the identification and mitigation of environmental impacts imposed by the BusConnects Programme, including but not limited to: • The preparation of an over-arching assessment of environmental and transport impacts and detailing the cumulative impacts of the Programme as a whole. • The development, in conjunction with all other relevant service providers, of a Construction Strategy. • The undertaking of a separate Environmental Impact Assessment (EIA) and preparation of a subsequent Environmental Impact Assessment Report (EIAR) for each of the 12 Schemes, prepared in accordance with all relevant legislation and industry best practice. These shall include Natura Impact Statements as appropriate for each Scheme. • The undertaking of a comprehensive strategic transport analysis and assessment for the Programme as a whole and the preparation of an overall Transport Impact Assessment (TIA) for the Programme. • Aligned with the TIA, to undertake a comprehensive transport analysis and assessment for each Scheme, including the provision of a Transport Impact Assessment for each Scheme. • The identification and development of proposed mitigation measures for incorporation into the EIAR and specimen design where required. • The preparation of documentation for the statutory processes to include the preparation of documentation and presentation of evidence at oral hearings • The collaboration with the EDs on all matters in relation to the Environmental Impact and Transport Impact of the Programme. • The provision of advices, as necessary, on all matters relating to the environment as they relate to the Programme. • The provision of key inputs to and collaborating with the appointed Business Case Service Provider to support the delivery of the Detailed Business Case. • The preparation of the environmental and transport sections of the tender documents in accordance with the agreed Construction Strategy.

Services

19/06/2019 12:00:00

71313400-9  Environmental impact assessment for construction
45262640-9  Environmental improvement works
60112000-6  Public road transport services
71220000-6  Architectural design services
71242000-6  Project and design preparation, estimation of costs
71300000-1  Engineering services
71313000-5  Environmental engineering consultancy services
71313420-5  Environmental standards for construction
71313430-8  Environmental indicators analysis for construction
71313440-1  Environmental Impact Assessment (EIA) services for construction
71320000-7  Engineering design services
71322000-1  Engineering design services for the construction of civil engineering works
71322500-6  Engineering-design services for traffic installations
71323000-8  Engineering-design services for industrial process and production
71327000-6  Load-bearing structure design services
71330000-0  Miscellaneous engineering services
71332000-4  Geotechnical engineering services
71335000-5  Engineering studies
71340000-3  Integrated engineering services
71400000-2  Urban planning and landscape architectural services
71600000-4  Technical testing, analysis and consultancy services
79415200-8  Design consultancy services
90713000-8  Environmental issues consultancy services
90720000-0  Environmental protection


National Transport Authority
Dun Sceine, Iveagh Court Harcourt Lane, D02WT20
Dublin
Dublin
Ireland
View profile

Mark Bradwell

Published notices
Contract notice - utilities (TED (v209)) 13/05/2019 18:10
Contract award notice - utilities (TED (v209)) 20/08/2019 12:12
Lots
Provision of Consultancy Services for the preparation of Environmental Impact Assessments and Transport Impact Assessments for the BusConnects Core Bus Corridor Programme
Additional information:
Documents Documents
Close