GDA29LHWC2019 - Conservation and Adaption Works to the Lower House on the Grangegorman Campus, Dublin 7

The RFT has ended, you cannot answer the invitation.

The works will include the stabilisation of the existing walls, some raking out and re-pointing of external stonework, stone repair and replacement where required, installation of a partial new roof structure and finishes to required section of building, reconstruction of internal floors, structural repairs where required, provision of new windows to entire building, new floor, wall and ceiling finishes and full mechanical and electrical and lift installation. Four new single storey extensions will be included totalling 400sq.m. There will be limited opening up and new works within the existing Basement. Overall floor area of existing building including basement is 3,935sq.m. Full external works will be required including opening up existing stairwells to Basement, paving, drainage and electrical site services, etc.

Works

29/04/2019 12:00:00

45000000-7  Construction work


Grangegorman Development Agency
Fourth Floor, Park House, 191 North Circular Road
Dublin
D07 EWV4
Ireland
View profile

Damien Morgan
http://www.ggda.ie

Published notices
Contract notice (TED (v209)) 21/03/2019 15:40
Lots
Conservation and Adaption Works to the Lower House on the Grangegorman Campus, Dublin 7
Additional information:
Documents Documents
Close