Shannon Airport Authority DAC wishes to procure the services of a Multi-Discipline Contractor for the purpose of Design, Installation, Integration, Validation and Certification of the delivery of a compliant Standard 3 Hold Baggage Screening System Upgrade at Shannon Airport. The project comprises the design, supply, installation, testing, integration, validation, commissioning and certification of a Standard 3 Hold Baggage System (HBS) Upgrade at Shannon Airport from concept development through to detail design, build and handover including associated statutory certifications required to deliver a compliant system. The project comprises any displacement relocation or construction works required to deliver a compliant system and should allow for the removal of the existing Standard 2 Screening Equipment at the airport, which comprises a sum of 2 standard lines and one out of gauge machine. The upgraded Standard 3 Hold Baggage Screening System should be fully operational in advance of the 01 September 2020 deadline. A full performance specification will be provided at Stage 2 -RFT.
Works
29/10/2018 15:00:00
38581000-1 Baggage-scanning equipment
34960000-4 Airport equipment
42417200-4 Conveyors
71000000-8 Architectural, construction, engineering and inspection services
71200000-0 Architectural and related services
71220000-6 Architectural design services
71221000-3 Architectural services for buildings
71223000-7 Architectural services for building extensions
71300000-1 Engineering services
71310000-4 Consultative engineering and construction services
71311000-1 Civil engineering consultancy services
71311100-2 Civil engineering support services
71311300-4 Infrastructure works consultancy services
71312000-8 Structural engineering consultancy services
71315000-9 Building services
71315100-0 Building-fabric consultancy services
71315200-1 Building consultancy services
71315210-4 Building services consultancy services
71320000-7 Engineering design services
71540000-5 Construction management services
71541000-2 Construction project management services
72224000-1 Project management consultancy services
Shannon Airport Authority DAC
Shannon Airport, Shannon
Co.
Clare
Ireland
View profile
pamela brooks
http://www.shannonairport.ie
Notice | Date of dispatch |
---|---|
Contract notice (TED (v209)) | 28/09/2018 17:40 |
Contract award notice (TED (v209)) | 20/09/2019 10:25 |