The project is to take place in the grounds of St. Marys GFC at Ardee Co. Louth, located on the south side of Ardee Town just off the main N2. The works will be scheduled on two seperate phases. Phase 1 of the project includes the construction of a walking track around the pitch to the rear of the site with the walking pathway commencing at the carpark area. The walking track will be illuminated via existing lighting and additional lighting to match existing that will allow the entire track to be used all year around. Phase 2 of the project includes works to upgrade existing car parking area with tarmacadam surface and all associated surface water drainage systems, lighting and line markings for 92 car parking spaces, which will include seven number of disabled parking spaces. Access will be provided throughout the construction process for the everyday activities of the club to be carried out unimpeded. A work area will be cordoned off to allow the contractor to park work vehicles adjacent to the work area. The final details of this lies at the discretion of St. Marys GFC commitee and the contractor will have to pay due consideration toward having to safely and carefully traverse from the road to the work site adjacent to the clubhouse and playing fields. The intended completion date for the Project is proposed for August 2019. The contractor will be obligated to provide a draft programme of works with Tender submission for review. In submitting a Bona Fide Tender, the contractor takes responsibility to complete the project within the time frame as submitted unless otherwise agreed with the Client. The tendering contractor must provide evidence of public and employee insurance and provide evidence of their experience in carrying out such projects.
Works
17/10/2018 12:00:00
45000000-7 Construction work
45111240-2 Ground-drainage work
45112000-5 Excavating and earthmoving work
45112100-6 Trench-digging work
45112200-7 Soil-stripping work
45233252-0 Surface work for streets
45233253-7 Surface work for footpaths
45233270-2 Parking-lot-surface painting work
45310000-3 Electrical installation work
45316100-6 Installation of outdoor illumination equipment
45342000-6 Erection of fencing
Ardee St. Mary's GFC
Páirc Mhuire, Blakestown
Co. Louth
Ardee
Ireland
View profile
Paul Daly
Notice | Date of dispatch |
---|---|
Contract notice (TED (v209)) | 17/09/2018 12:25 |
Contract award notice (TED (v209)) | 17/05/2019 18:25 |
The project is to take place in the grounds of St. Marys GFC grounds at Ardee Co. Louth. The works will be scheduled on two seperate phases. Phase 1 includes the construction of a walking track and Phase 2 includes works to car park.