It is proposed to establish a Multi-Party Framework for demolition contractors for Dublin City Council. The works will consist of demolition (former flat blocks, old housing stock, derelict buildings and other buildings or structures etc), site clearance, removal of asbestos, provision of weathering and support to adjoining buildings, fencing and temporary works. Also included are minor building and landscaping works associated with the rendition of sites as non-derelict. Weathering of adjoining buildings, façade retention and/or temporary works may be required in certain instances. Design of temporary works and façade retention works may form part of the works. Asbestos surveys and removal may also form part of the works. The Framework Agreement will apply to individual projects with anticipated values ranging from €15,000 to €1,000,000. The majority of projects are envisaged to be less than €500,000 in value. Applications are only invited from contractors who have a proven track record in demolition and ancillary works as described above. Applications are not invited from general building contractors who propose to sub-contract the whole of the works. Applicants may include the following specialists as sub-contractor: Asbestos Surveyor, Asbestos Removal Specialist, Structural Engineer/Temporary Works Designer.
Works
07/09/2018 12:00:00
45111100-9 Demolition work
45110000-1 Building demolition and wrecking work and earthmoving work
Dublin City Council
Civic Offices, Wood Quay
Dublin
Dublin 8
Ireland
View profile
David Conway
Notice | Date of dispatch |
---|---|
Contract notice (TED (v209)) | 30/07/2018 13:10 |
Contract award notice (TED (v209)) | 20/05/2019 13:40 |
Works will typically include demolition of former flat blocks, old housing stock, derelict buildings and other buildings or structures etc.