18P023 - TV News Studio Video Wall & Automation

The RFT has ended, you cannot answer the invitation.

RTÉ intends to upgrade its News Studio (Studio 3) in 2018. RTÉ will request suitable companies for the supply of equipment, system integration and associates services. The space on the Studio 3 Floor will be expanded to provide two presentation areas using the same camera chain (with the addition of a new robotic camera and a camera rail). This will be achieved by removing the existing video-wall and replacing it with a new thinner wall. A new smaller desk will be designed and installed on the left hand side of the studio floor. This will free up space for a second presentation area on the right hand side of the studio. New graphics will be designed for the new video-wall to give a new look to RTÉ News. Tungsten lighting will be replaced with LED lighting to give daylight colour temperature. The project will provide the capability for the increased use of Automation, Augmented Reality and graphics templates. All Tender Documents are contain in the eTenders Lot 1 folder

Supplies

11/07/2018 13:00:00

32211000-5  Broadcast production equipment
30231300-0  Display screens
31520000-7  Lamps and light fittings
32320000-2  Television and audio-visual equipment
92220000-9  Television services


Raidió Teilifís Éireann ( RTÉ )
Donnybrook
Co. Dublin
Dublin
Ireland
View profile

Eamonn Reid
http://www.rte.ie

Published notices
Contract notice (TED (v209)) 01/06/2018 12:10
Contract award notice (TED (v209)) 30/01/2020 12:25
Lots
LED Wall, Video Wall Processor, Augmented Reality and associated System Integration
Additional information:
Documents Documents
Robotics and Installation
Additional information:
Documents Documents
LED Lighting
Additional information:
Documents Documents
Studio Automation System and associated System Integration
Additional information:
Documents Documents
Close