P10360 - Design and Construction Services for North Apron 5H Stands Main Works

The RFT has ended, you cannot answer the invitation.

The successful Contractor will be required to assemble a Design and Construction team led by a Project Manager to undertake the detailed design and construction of Stand 5H and the associated infrastructure. The proposed development of Apron 5H is located in the northern part of Dublin Airport, south-east of the future North Runway (NR) and future Parallel Taxiway (FPT) and east of Apron 5G.

Works

21/12/2017 15:00:00

45235100-4  Construction work for airports
45000000-7  Construction work
45200000-9  Works for complete or part construction and civil engineering work
45220000-5  Engineering works and construction works
45235110-7  Construction work for airfields
45235111-4  Airfield pavement construction work
45235300-6  Construction work for aircraft-manoeuvring surfaces
45235310-9  Taxiway construction work
45235311-6  Taxiway pavement construction work
45235320-2  Construction work for aircraft aprons


daa plc
Dublin Airport
Co Dublin
Dublin
Ireland
View profile

Brian Collier
http://www.daa.ie

Published notices
Contract notice - utilities (TED (v209)) 14/11/2017 14:10
RFI
Lots
Design and Construction Services for North Apron 5H Stands Main Works
Additional information:
Documents Documents
Close