To access the Qualification Questionnaire please log on to (http://www.coillte.ie/) go to Suppliers - click on SMS link to access Coillte’s Supplier Management System (SMS) or click on the direct link below; https://supplierlive.proactisp2p.com/Account/Login The mountain-bike trail network when completed will comprise of more than 100kms of trails in the Slieve Bloom Mountains and was granted planning permission by Laois and Offaly County Councils in March 2017. It is centred on two trailheads, one near/ in Kinnitty village in Co. Offaly and one in the heart of the Baunreagh valley, Co. Laois. The first phase (to which this PQQ and subsequent tender applies) will design and build approximately 27kms of singletrack non-bitmac mountain bike trails and these will link with a further 8kms of existing forest roads to provide a total of 35kms of trail network. The first phase will build trails centred at both trailheads and both will be connected via the public road over the county boundary. The first phase will also include the construction of rural public road crossings, a footbridge, hard standing for car-parking and installation of signage and waymarking. The macro-design carried out to date for the trail network has identified suitable trail corridors for each trail section, within which the definitive trail line will be designed and built. The corridors are up to a maximum of 100m width and the trail construction zone will be a maximum of 5m width within that corridor. The finished trail surface will be no more than 600mm width within that trail construction zone (unless otherwise specified).
Services
04/12/2017 15:00:00
45220000-5 Engineering works and construction works
45200000-9 Works for complete or part construction and civil engineering work
71311000-1 Civil engineering consultancy services
71311100-2 Civil engineering support services
71322000-1 Engineering design services for the construction of civil engineering works
98350000-1 Civic-amenity services
Coillte CGA
Newtownmountkennedy
Co Wicklow
Wicklow
Ireland
View profile
Sinead Cronin
http://www.coillte.ie
| Notice | Date of dispatch |
|---|---|
| Contract notice (TED (v209)) | 03/11/2017 15:40 |
The first phase (to which this PQQ and subsequent tender applies) will design and build approximately 27kms of singletrack non-bitmac mountain bike trails and these will link with a further 8kms of existing forest roads to provide a total of 35kms of trail network.