The proposed development works to the Brewhouse Building to facilitate its conversion to a range of uses including Education, Research and Development, and / or Office facility consists of : • The retention and re-use of the Brewhouse Building (approx. 4,530 sq.m.), a 2 / 3 and part 4 and 5 storey concrete framed building. • The demolition of a two storey steel framed extension to the south of the original “Bauhaus” structure.(855sq.m. ground and 110 sq.m. Second Floor.) • Construction of a new 220 sq.m. penthouse level over the northern section of the building. • Insertion of new floors in voids at first and second floor level to create additional floor space within the existing building envelope. Replacement of part of the existing roof structure • This building is to be constructed to a L.E.E.D Gold certified standard
Works
15/03/2017 12:00:00
45000000-7 Construction work
45111291-4 Site-development work
45210000-2 Building construction work
45211350-7 Multi-functional buildings construction work
45211360-0 Urban development construction work
45213000-3 Construction work for commercial buildings, warehouses and industrial buildings, buildings relating to transport
45213150-9 Office block construction work
45214000-0 Construction work for buildings relating to education and research
Kilkenny Abbey Quarter Development Ltd
1 Dean Street, Kilkenny
Co.Kilkenny
Kilkenny
Ireland
View profile
John Walsh
| Notice | Date of dispatch |
|---|---|
| Contract notice (TED (v209)) | 09/02/2017 17:40 |
Corrigendum (TED (v209))
|
23/11/2018 10:40 |
| Contract award notice (TED (v209)) | 25/07/2019 17:40 |