Historic Leinster House is situated within a complex building environment where there is restricted access, strict security constraints, restricted allowable working times and where there are live operational buildings within the immediate context of the building. The proposed works comprise full rewiring of Historic Leinster House to current standards – this will include the stripping out of existing installations, dismantling and removal of existing lift and installation of a new evacuation lift, the formation of new service routes, the relocation of the existing switch and comms rooms and provision of new distribution boards in fire-proofed enclosures. The carrying out of general conservation works including removal, repair and reinstatement of historic fabric, maintaining good housekeeping, and component protection and tracking. The carrying out of structural strengthening to most existing timber floors. The carrying out of fire upgrading works including the installation of fire-barriers to provide adequate compartmentation. The carrying out of stone repairs both internally and externally, stabilisation and repair of existing decorative lath and plaster ceilings, re-roofing works including extensive lead-work, copper gutters and linings.
Works
06/02/2017 12:00:00
45351000-2 Mechanical engineering installation works
42500000-1 Cooling and ventilation equipment
42520000-7 Ventilation equipment
44115200-1 Plumbing and heating materials
44163121-4 Heating pipes
45220000-5 Engineering works and construction works
45232141-2 Heating works
45331000-6 Heating, ventilation and air-conditioning installation work
45331200-8 Ventilation and air-conditioning installation work
45331210-1 Ventilation installation work
71300000-1 Engineering services
71333000-1 Mechanical engineering services
71334000-8 Mechanical and electrical engineering services
Office of Public Works (OPW)
Jonathan Swift Street
Co. Meath, C15 NX36
Trim
Ireland
View profile
Garret Nolan
https://www.gov.ie/en/organisation/office-of-public-works/
| Notice | Date of dispatch |
|---|---|
| Contract notice (TED (v209)) | 22/12/2016 13:10 |
Corrigendum (TED (v209))
|
04/01/2017 16:10 |
The proposed works comprise Full rewiring of Historic Leinster House to current standards Stripping out of existing installations General conservation works Structural strengthening of existing timber floors Fire upgrading works throughout to provide adequate compartmentation Stone repairs both internally and externally Stabilisation and repair of lath and plaster ceilings Re-roofing works including extensive lead-work, copper gutters and linings