The site is in the townland of Ballygarraun, Athenry, Co. Galway. The works are a continuation of the Phase 1 roadworks that were completed in 2010. Phase 1 links the M6 Motorway and regional Road R348. Phase 2 will extend northwards from the R348 and will include the following, along with other works: - Single carriageway over 600m in length; - Footway / Cycleway of varying widths and length; - A roundabout; - A road over rail bridge; - A road over road bridge; - Earthworks; - Fencing; - Safety barrier systems and parapets; - Drainage; - Signing and lining; - Lighting; - Works for statutory authorities; - Private and public utlities inclusive of diversion works; - Ducting and chambers; - Accommodation works and water supplies.
Works
11/11/2016 12:00:00
45233100-0 Construction work for highways, roads
45221110-6 Bridge construction work
45221112-0 Railway bridge construction work
IDA Ireland
Three Park Place
Hatch Street Upper
Dublin 2
Ireland
View profile
Linda Corbett
http://www.idaireland.com
| Notice | Date of dispatch |
|---|---|
| Contract notice (TED (v209)) | 30/09/2016 16:55 |
| Contract award notice (TED (v209)) | 03/09/2019 10:10 |