New Acute Mental Health Unit - New Acute Mental Health Unit at Sligo University Hospital

The RFT has ended, you cannot answer the invitation.

The works consist of the construction of a new part single storey and part two story acute mental health unit along with stores and ancillary hospital accommodation. The gross floor area of the new building is approximately 3500sqm.Works include demolition of existing single storey modular building, significant reduction of site levels, new retaining walls, link to hospital, new internal road arrangement, car parking and other associated site works. The proposed construction is concrete frame structure with steel roof structure. External walls are generally Masonry cavity walls with sections of rain screen cladding. Roofs are a mixture of flat and pitched roofs. The applicant should note that the main hospital will remain operational throughout the works. As a result, works for occupied areas will need to be done at night and outside of normal working hours The applicant should note that the Lift, Mechanical and Electrical works will be undertaken by specialists selected by the contracting authority and nominated to the main contractor as indicated in section 1.7.

Works

18/11/2016 12:00:00

45000000-7  Construction work
45215100-8  Construction work for buildings relating to health
45310000-3  Electrical installation work
45313100-5  Lift installation work
45350000-5  Mechanical installations


Health Service Executive (HSE)
Head Office
Millennium Park
Naas
Ireland
View profile

Kevin Gunn
http://www.hse.ie

Published notices
Contract notice (TED (v209)) 30/09/2016 16:10
Lots
Main Contractor
Additional information:
Documents Documents
Reserved Specialist - Electrical
Additional information:
Documents Documents
Reserved Specialist - Mechanical
Additional information:
Documents Documents
Reserved Specialist - Lifts
Additional information:
Documents Documents
Close