16/097 - 16/097 - Tullamore and Birr Water Supply Schemes Project

The RFT has ended, you cannot answer the invitation.

The contract consists of the design, construction, commissioning, testing, operation service of the existing water treatment plants and upgraded water treatment plants together with site development and ancillary works and all associated pipelines as follows: Design-Build: Tullamore Water Supply Scheme – Clonaslee Water Treatment Plant The existing Clonaslee Water Treatment Plant (WTP) is located on a brownfield site and will be upgraded to provide a treated water output capacity of 2,600m³/day. The proposed development works are explained in more detail in the PQQ document. Tullamore Water Supply Scheme – Ardan Water Treatment Plant The proposed Ardan WTP is to be located on a greenfield site adjacent to the existing Ardan borehole site and will have a treated water output capacity of 5,900 m³/day. The proposed development works are explained in more detail in the PQQ document. Birr Water Supply Scheme – Birr Water Treatment Plant The existing Birr Water Treatment Plant (WTP) is located on a brownfield site and will be upgraded to provide a treated water output capacity of 3,600m³/day. The proposed development works are explained in more detail in the PQQ document. Operation Service includes; • Operation Service of the existing works, from the existing intakes to the outlet of the plants, for a minimum period of 18 months (i.e. from 30 days after commencement to date of commissioning certificate) • Operation Service of the new / upgraded works, from the existing intakes to the outlet of the plants, for a minimum period of 1 year with the option to extend for a further period of up to 3 years at the sole discretion of the Contracting Entity. •The Operation Service element of the works shall be carried out of in accordance with Irish Water’s Asset Management System (IBM Maximo). Full details of the scope of works and phasing of the works will be detailed in the ITT.

Works

23/08/2016 12:00:00

45252120-5  Water-treatment plant construction work
44161200-8  Water mains
44611600-2  Reservoirs
45232422-6  Sludge-treatment works
45232430-5  Water-treatment work
45252126-7  Drinking-water treatment plant construction work
45315100-9  Electrical engineering installation works
45351000-2  Mechanical engineering installation works
65130000-3  Operation of water supplies
90513800-4  Sludge treatment services


Uisce Éireann
Tender Administration, PO Box 900, Webworks, Eglinton Street,
Co.Cork
Cork
Ireland
View profile

Tender Admin
https://www.water.ie/

Published notices
Contract notice - utilities (TED (v209)) 29/06/2016 10:10
    Corrigendum (TED (v209)) 22/07/2016 11:55
    Corrigendum (TED (v209)) 15/08/2016 14:25
Contract award notice - utilities (TED (v209)) 17/07/2019 12:25
Lots
16/097 - Tullamore and Birr Water Supply Schemes Project

Irish Water plans to undertake the development of three existing Water Treatment Plants (WTPs) together with associated Source, Reservoirs and Pipeline works as part of the Tullamore and Birr Water Supply Schemes Project.The planned works are necessary to ensure compliance with EU Directives, Irish National Standards and Regulations relating to treated water for human consumption.It is intended that the works will be implemented under a DBO Contract.

Instructions to bidder:

Documents are available to all candidates who register their interest through etenders. All queries for clarification must be submitted via email to Tenders@ervia.ie. The questionnaire must be completed and returned to the address detailed in the attached document not later than 12.00hrs Tuesday 23rd August 2016.

Additional information:
Documents Documents
RFT mailing address:
tenders@ervia.ie
Ireland
Close